Experimental requirements
1. Configure the uplink and downlink connection switches (active and backup).

Device configuration:
1.1 Graphical configuration of uplink and downlink connection switches (active and backup)
1.1.1 Turn on dual-machine hot standby, check the active and standby backup, select the heartbeat interface, specify the peer IP, and create VRRP monitoring. The virtual IP address is the upstream and downstream gateway


1.1.2 Release the traffic from trust to untrust zone on FW1, and it will be automatically synchronized to the backup device FW2.


1.2 Command line mode to configure uplink and downlink connections to the switch
1.2.1 Configuring dual-machine hot standby
①Enter the interface view and specify the virtual IP and port roles


②Specify the heartbeat interface and remote address

③Specify device role

④Turn on HRP

1.2.2 Configure the security policy to allow traffic from trust to untrust, which will be automatically synchronized to the backup device.

Test phenomenon:
① Check the HRP status of the active and standby devices. The role of the active device is active and the standby device is standby.


② Disconnect the link between FW1 and SW1, the status of HRP changes, and the standby device becomes the master device.
[SW1-GigabitEthernet1/0/1]shutdown